Time Lapse Video of a Turnkey installation
Time Lapse Video of Goltens’ turnkey retrofit of an 83,000 Ton LNG in MMHE shipyard in Johor, Malaysia. The installations of the the two systems were completed in only 18 days.
Learn More Watch NowTime Lapse Video of Goltens’ turnkey retrofit of an 83,000 Ton LNG in MMHE shipyard in Johor, Malaysia. The installations of the the two systems were completed in only 18 days.
Learn More Watch NowA leading seismic survey vessel operator selected Optimarin’s 334m3/hour OBS ballast water treatment system for one of its research vessels. Goltens had previously completed two successful retrofits for this owner and was awarded this retrofit as well. The timeline was relatively short with only a 3-month window between project kick off and completion of the installation.
Learn More Watch NowSee how Goltens Green Technologies leveraged its well tested retrofit process to help an LPG tanker owner meet its Sulphur Emissions and Ballast Water compliance requirements. Using 3D laser scanning and modeling to support the detailed design of the two systems, Goltens completed a turn-key retrofit of a Kwang Sung Open Loop EGCS system and two Alfa Laval PureBallast 3.1-750 ballast water treatment systems on the 82,000 DWT LPG tanker.
Learn More Watch NowWatch an overview of Goltens Green Technologies’ retrofit process. See what makes us the global leader in environmental compliance retrofit services.
Learn More Watch Now3D model of a Hyde Guardian HG250GC Ballast Water Treatment system over 3D scan output aboard the Seaboard Patriot. Goltens performed 3D scanning, system modeling, detailed engineering, prefabrication of piping…
Learn More Watch NowOn the Konstantin Jacob, a product tanker owned by Ernst Jacob, Goltens did a successful turn-key installation on a large ozone based ballast treatment system from NKO3. The vessel was scanned in Rotterdam…
Learn More Watch NowWatch a demonstration of Goltens 3D laser scanning technology produce an image of an Optimarin Ballast System (1000 m3) on a container ship as part of retrofit planning.
Learn More Watch Now3D model of a Hyde Guardian 300m3/hour Ballast Water Treatment system over 3D scan output aboard the Polar Queen, an ROV Survey/Construction vessel. Goltens performed 3D scanning, system modeling, detailed…
Learn More Watch NowThis is the sister vessel of a ship where Goltens Worldwide did a retrofit installation of an Optimarin ballast water treatment system. The model from the first vessel has been inserted into the point cloud of its sister vessel.
Learn More Watch NowThese 3D scans were done onboard a recently built car carrier. There was already space set apart for a later installation of a treatment system.
Learn More Watch NowWatch a ballast water treatment retrofit installation carried out while sailing with the vessel by the Goltens installation team.
Learn More Watch NowThe experts at Goltens Green Technologies use 3D laser scanning and modeling to create a concept model of how a Optimarin Ballast System (200 m3/hr) would fit in a bulk carrier planning a ballast water.
Learn More Watch Now