be_ixf;ym_202611 d_27; ct_150

Engineering Solution to Meet Offshore Regulatory Requirements

HAZARDOUS MATERIAL DRIP TRAYS

To comply with local environmental regulations, the operator of a DP3 semisubmersible vessel required the installation of drip trays beneath hose reels at loading stations on both the port and starboard sides.

The new drip trays needed to be integrated with the vessel’s existing hazardous drainage system. The project required precise engineering to accommodate existing structures and equipment while ensuring timely delivery to avoid disruption to vessel operations.

3-D SCAN BASED ENGINEERING & DETAILED DESIGN

Goltens Green Technologies mobilized specialists offshore to conduct a detailed 3D scan of the hose reel areas and surrounding structures, capturing accurate measurements to support the retrofit design.

Using the scan data, Goltens engineered custom drip trays to fit beneath the existing hose reels, along with new drain piping to connect the trays to the vessel’s hazardous drain lines.

The comprehensive engineering package included structural strength calculations, construction drawings, and cutting files for the drip trays, together with updated piping diagrams, isometric drawings, and material lists for the drainage connections.

The design accounted for existing vessel arrangements and installation constraints, providing the customer with a complete documentation package for fabrication and installation.

  • Drip tray design modeled under existing hose reels

    Drip tray design modeled under existing hose reels

  • Drip tray design modeled under existing hose reels

    Drip tray design modeled under existing hose reels 2

  • Top view of drip tray design

    Top view of drip tray design

  • New drain lines routed and connected to ship system

    New drain lines routed and connected to ship system

SCOPE OF WORK

  • Offshore 3D scanning and vessel survey
  • Concept and detailed engineering
  • Structural design and strength calculations
  • Drain piping design and integration
  • Fabrication drawings, cutting files, and material specifications
  • Project management

THE RESULTS – INSTALLATION IN 16 DAYS

A Regulatory-Compliant Retrofit Design Ready for Fabrication

Goltens delivered a complete engineering solution for integrating the new drip trays and drainage connections with the vessel’s existing hazardous drain system.

The detailed engineering package enabled accurate fabrication and efficient installation planning, supporting the customer’s regulatory compliance objectives while minimizing potential disruption to vessel operations.
 

Download a PDF of this Resource

(Right click and select "Save File As..." or "Save Link As..." to save)

Download Now
Dev Tool:

Request: resources/engineering-solution-to-meet-offshore-regulatory-requirements
Matched Rewrite Rule: resources/([^/]+)(?:/([0-9]+))?/?$
Matched Rewrite Query: resources=engineering-solution-to-meet-offshore-regulatory-requirements&page=
Loaded Template: single-resources.php
Search Goltens ×